Memphis Zoning Watch

A two-year time extension to install a 150 foot concealed CMCS Tower

AI-generatedPlain-English summary — always check the source document.

The applicant seeks a two-year extension to build a 150-foot concealed cellular communications tower that was originally approved in 2013. The tower would be installed on the Kingsbury Elementary and High School Campus to improve cellular coverage in the area.

Read the staff report this summary came from

Case details

Location
1304 N. Graham
Jurisdiction
City of Memphis
Next step if approved
Proceeds to the Memphis City Council.

Case history

  1. August 13, 2015

    Land Use Control Boardhearing scheduled in the staff report

    Source document

Sources

Every case detail on this page — dates, districts, parcels, staff recommendations — is read directly from the public documents below. The only exception is the summary at the top, which is AI-generated and labelled as such.

Something here look wrong? Report an error on this page.